What was found
STL - DURING OP-16, FOUND MAIN FRAME CRACK AT RIGHT SIDE THROUGH RADIUS, STATION 718. REPLACED MAIN FRAME PER SRM 51-10 AND CHAPTER 20, TWA STANDARD PRACTICES. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
STL - DURING OP-16, FOUND MAIN FRAME CRACK AT RIGHT SIDE THROUGH RADIUS, STATION 718. REPLACED MAIN FRAME PER SRM 51-10 AND CHAPTER 20, TWA STANDARD PRACTICES. (M)