What was found
MCI - DURING OP 15 MAINTENANCE CHECK, THE LEFT WING OUTBOARD FLAP HINGE CASTING ATTACH RIBS WERE CRACKED ON INBOARD AND OUTBOARD SIDES INSIDE FLAP STRUCTURE. RIBS REMOVED AND NEW RIBS INSTALLED PER SRM 51-01, AND FASTENERS INSTALLED PER STANDARD PRACTICES AND 51-30-00. (M)