What was found
MCI - DURING OP 16 MAINTENANCE CHECK, FOUND CORROSION ON FLOORBEAM CAP AT STATION 256, LBL 20 TO RBL 20. FABRICATED NEW BEAM AND INSTALLED PER SRM 51-01, PAGE 1. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MCI - DURING OP 16 MAINTENANCE CHECK, FOUND CORROSION ON FLOORBEAM CAP AT STATION 256, LBL 20 TO RBL 20. FABRICATED NEW BEAM AND INSTALLED PER SRM 51-01, PAGE 1. (M)