What was found
MCI - DURING OP 16 MAINTENANCE CHECK, FOUND SUPPORT BRACKET ON AFT PRESSURE BULKHEAD AFT OF 24 RL CRACKED AT STA 579. REPLACED CRACKED ANGLE PER SRM 51-00. TOTAL TIME: 72,580 HOURS. TOTAL CYCLES: 77,573. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MCI - DURING OP 16 MAINTENANCE CHECK, FOUND SUPPORT BRACKET ON AFT PRESSURE BULKHEAD AFT OF 24 RL CRACKED AT STA 579. REPLACED CRACKED ANGLE PER SRM 51-00. TOTAL TIME: 72,580 HOURS. TOTAL CYCLES: 77,573. (X)