What was found
MCI - DURING OP 16 MAINTENANCE CHECK FOUND CORROSION OF FLOORBEAM NUT PLATE HOLE AREA FROM STA 703 TO STA 720, ABOVE S28L. REPAIRED PER SRM 51-40-4, AND STANDARD PRACTICES. INSTALLED DOUBLER. TOTAL TIME: 72,114 HOURS. TOTAL CYCLES: 78,035. (X)