What was found
DURING OP 16 MAINT CHECK, FOUND INTERCOSTAL AT 29R BADLY CORRODED AT STA 965 TO 980. MADE NEW PER SRM 51-01, FABRICATED INTERCOSTAL FROM 7075-0 AND HEAT TREATED PER SRM 53-11-3 PAGE 108. REMOVED CORROSION BY REPLACING INTERCOSTAL PER SRM 51-01, PAGE 1 ITEM C. INSTALLED RIVETS PER SRM 51-30-02. SMOOTHED AND FINISH PAINTED PER STD PRACTICE.