What was found
DURING OP 16 MAINT CHECK, FOUND CRACK IN AFT SIDE OF FORMER RING, STA 1087, LBL 10 IN. INSTALLED NEW FORMER RING FOOT PER STD PROCESS MANUAL 6-70-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING OP 16 MAINT CHECK, FOUND CRACK IN AFT SIDE OF FORMER RING, STA 1087, LBL 10 IN. INSTALLED NEW FORMER RING FOOT PER STD PROCESS MANUAL 6-70-01.