What was found
DURING CHECK-C MAINT, MO 72F01 PHASE A, RT ELEVATOR SLAVE LINKAGE LOST MOTION DEVICE, REQUIRED INSTALLATION OF A NEW TEE AS SHOWN IN FIGURE 2 OF SERVICE BULLETIN 27A0136 REV 1. INSTALLED A TEE PER MODIFICATION ORDER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING CHECK-C MAINT, MO 72F01 PHASE A, RT ELEVATOR SLAVE LINKAGE LOST MOTION DEVICE, REQUIRED INSTALLATION OF A NEW TEE AS SHOWN IN FIGURE 2 OF SERVICE BULLETIN 27A0136 REV 1. INSTALLED A TEE PER MODIFICATION ORDER.