What was found
DURING OP 16 MAINT CHECK, FOUND ONE HOLE DRILLED INTO LATERAL RIB, TWO INTO LONGITUDINAL RIB AT STA 83.5 X=-10. HOLES DUE TO REPAIR IN FUSELAGE SKIN. BLENDED HOLE IN LATERAL RIB AT STA 83 AND SMOOTHED. INSTALLED REPAIR DOUBLE PER SRM 53-03, FIG 34 AND ARA 13511. INSTALLED NEW LONGITUDINAL RIB PER SRM 51-01.