What was found
DURING OP 16 MAINT CHECK, THE VERTICAL SUPPORT FROM CARGO BIN TO FLOORBEAM WAS CRACKED AT TOP, STA 756 RBL 22 INCHES, AFT SIDE OF BEAM. STOP DRILLED CRACK PER SRM 53-01, PAGE 10. INSTALLED REPAIR ANGLES.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING OP 16 MAINT CHECK, THE VERTICAL SUPPORT FROM CARGO BIN TO FLOORBEAM WAS CRACKED AT TOP, STA 756 RBL 22 INCHES, AFT SIDE OF BEAM. STOP DRILLED CRACK PER SRM 53-01, PAGE 10. INSTALLED REPAIR ANGLES.