What was found
DURING OP 16 MAINT CHECK, FOUND LONGERON 30 SPLICE CORRODED AT STA 960. REMOVED SPLICE AND INSTALLED NEW SPLICE PER SRM 51-60-0, PAGE 27, AND SRM 51-30-5, AND DOUGLAS INSTALLATION DRAWING 5919707.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING OP 16 MAINT CHECK, FOUND LONGERON 30 SPLICE CORRODED AT STA 960. REMOVED SPLICE AND INSTALLED NEW SPLICE PER SRM 51-60-0, PAGE 27, AND SRM 51-30-5, AND DOUGLAS INSTALLATION DRAWING 5919707.