What was found
DURING OP 16 MAINT CHECK AT STA 83 FORMER WAS CRACKED AT RBL 10. STOP DRILLED CRACK AND HIGH FREQ EDDY CURRENT STOP DRILL PER NDT PART 6. CRACK CONTAINED PER 51-00-03. CRACK REPAIRED PER SRM 53-03, FIG 34.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING OP 16 MAINT CHECK AT STA 83 FORMER WAS CRACKED AT RBL 10. STOP DRILLED CRACK AND HIGH FREQ EDDY CURRENT STOP DRILL PER NDT PART 6. CRACK CONTAINED PER 51-00-03. CRACK REPAIRED PER SRM 53-03, FIG 34.