Service difficulty report · Bracket · Urocop EC120B

Difficulty date
June 14, 2002
Submitted
July 17, 2002
Operation
Air carrier
Aircraft
N116KG
Make and model
Urocop EC120B
Aircraft serial
1152
Part
Bracket
Part number
205131
Condition
Corroded
Location
Float
Part time
940 hours
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING A GROUND HANDLING OPERATION, IT WAS DISCOVERED THE FLOAT ASSEMBLIES OFFERED RESISTANCE TO MOVEMENT, SWINGING FROM A FIXED FLIGHT POSITION, TO A GROUND HANDLING POSITION. FURTHER INVESTIGATION REVEALED, THE RIGHT FORWARD ATTACH BRACKET OF THE FLOAT ASSEMBLY WAS CORRODED/CRACKED. THE (ALUMINUM) FIXED BRACKETS, FOR/AFT ARE ATTACHED TO THE INSIDE OF THE BOX-BEAM SUPPORT OF EACH FLOAT ASSEMBLY, THROUGH A BOLT/WASHER ATTACHMENT. THE MAIN BODY OF EACH BRACKET, SECURED INSIDE THE BOX BEAM, ONLY REVEALS THE AIRFRAME ATTACH POINT OF EACH BRACKET, RENDERING THE MAJORITY OF THE BRACKET HIDDEN WEN INSTALLED. WITH THE DISCOVERY OF THE DISCREPANT BRACKET, THE FLOAT ASSEMBLIES WERE REMOVED FROM THE AIRCRAFT, TO REMO

More about the Urocop EC120B