What was found
DURING ACCOMPLISHMENT OF AD 2016-05-12, SERVICE BULLETIN 747-53A2507 REVISION 2, FOUND BS 1160 PREVIOUS TENSION TIE ATTACH POINT WITH 2 FASTENER HOLES CRACKED. ACCOMPLISHED PARTIAL FRAME SEGMENT REPLACEMENT IAW SRM 53-40-07, REPAIR 3.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING ACCOMPLISHMENT OF AD 2016-05-12, SERVICE BULLETIN 747-53A2507 REVISION 2, FOUND BS 1160 PREVIOUS TENSION TIE ATTACH POINT WITH 2 FASTENER HOLES CRACKED. ACCOMPLISHED PARTIAL FRAME SEGMENT REPLACEMENT IAW SRM 53-40-07, REPAIR 3.