Service difficulty report · Pump · Bombdr BD1001A10

Difficulty date
January 4, 2025
Submitted
January 9, 2025
Operation
Air carrier
Aircraft
N545XJ
Make and model
Bombdr BD1001A10
Aircraft serial
20278
Aircraft time
15,648 hours, 7,078 cycles
Part
Pump
Condition
Failed
Location
Hyd System
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
B, A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

RT HYD TEMP HIGH , ASSOCIATED WITH THE HYD ENG PUMP FAIL. EMERGENCY DECLARED. MX C/A: VERIFIED THE RH EDP FAILED CARRIED OUT THE GVI OF THE EDP AFTER DRY OPERATION. VERIFIED THE RH EDP FAILED IRW CL 300 AMM 05-51-29. REMOVED AND REPLACED THE RIGHT HAND EDP. REMOVED AND REPLACED THE CASE DRIAN FILTER MANIFOLD. SERVICED RIGHT HAND HYDRAULIC SYSTEM. OPS AND LEAK CHECK, NO DISCREPANCY NOTED AT THIS TIME IRW CL300 AMM 29-10-00 AND 29-12-01.