Service difficulty report · Hydraulic Line · Gulstm GIV

Difficulty date
August 26, 2026
Submitted
September 5, 2026
Operation
Air carrier
Aircraft
N131JE
Make and model
Gulstm GIV
Aircraft serial
1408
Aircraft time
17,919 hours, 8,521 cycles
Part
Hydraulic Line
Condition
Leaking
Location
Zone 700
Stage of operation
CR
How discovered
O
Nature of condition
K, J
Precautionary procedure
B

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

HYD FLUID FROM RT MLG ACTUATOR HOSE. REMOVED RT BRACE ACTUATOR'S PRESSURE & RETURN LINES, INSTALLED NEW HYD LINES IAW GIV-MSG-3 AMM. 32-01-00. COMPLIED WITH SYSTEM BLEEDS, OPS & LEAK CHKD WITH NO FURTHER DISCREPANCIES NOTED.