What was found
AFT PIT SHEAR TIE BETWEEN S28R AND 27R IS CORRODED. MAJOR REPAIR ACCOMPLISHED. REMOVED SHEAR TIE AND FABRICATED & INSTALLED A NEW SHEAR TIE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AFT PIT SHEAR TIE BETWEEN S28R AND 27R IS CORRODED. MAJOR REPAIR ACCOMPLISHED. REMOVED SHEAR TIE AND FABRICATED & INSTALLED A NEW SHEAR TIE.