What was found
LEFT WING DRY BAY NR 1 DRAIN HOLE & RIGHT WING DRY BAY NR 3 DRAIN HOLE LEAKING FUEL. BOROSCOPE INSPECTED LT DRY BAYS NR 1, 2 & 3. FOUND NR 1 DRY BAY LEAKING AT O/B AND AFT FIBERGLASS PNLS. INSP'D NR 1 RT DRY BAY, NO LEAK FOUND. NEED TO CONTINUE T/S ON RT NR 2 AND NR 3 DRY BAYS. PRESSURIZED FUEL SYSTEM FOR 1HR. NO LEAKS FOUND. REMOVED OLD BAD SEALANT FROM FIBERGLASS PNK 532HZ, CLEANED AND PREPARED TO SEAL. NEED TO INSPECT O/B PYLON FUEL PNL. NEW SEALANT IN FUEL OFFICE. INSPECTED O/B PYLON PNL AND APPLIED A B SEALANT AT 1300. LT & RT TANKS SEALED, CURE TIMES TO 0130 01JUN, THEN ACP LEAK CK.