What was found
PASSENGER LOAD BRIDGE CONTACT FUSELAGE SKIN AROUND SECTION 41 BETWEEN STATIONS 550 AND 571 CAUSING MULTIPLE SCRATCHES. MAJOR REPAIR ACCOMPLISHED: OPENED UP AREA FOR HIDDEN DAMAGE INSPECTION, MAPPED FOR EVAL. CUT-OUT 2 EACH SECTIONS OF DAMAGE, AND ACCOMPLISHED HFEC INSPECTION OF CUT-OUTS. NO CRACKS NOTED. ALSO ACP'D HFEC OF CRITICAL OUTER FASTENER ROW AND NO CRACKS NOTED. FABRICATED & INSTALLED A REPAIR DOUBLER AND FILLERS (REPAIR #6).