What was found
DURING STAGE 2 TENSION TIE INSP FOUND 3 FASTENER HOLES CRACKED ON UPPER DECK FRAME AT BS 1140 LT SIDE. MAJOR REPAIR ACCOMPLISHED: CUT OUT DAMAGED AREA, SPLICED IN NEW FRAME SECTION.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING STAGE 2 TENSION TIE INSP FOUND 3 FASTENER HOLES CRACKED ON UPPER DECK FRAME AT BS 1140 LT SIDE. MAJOR REPAIR ACCOMPLISHED: CUT OUT DAMAGED AREA, SPLICED IN NEW FRAME SECTION.