What was found
DURING STAGE 2 TENSION TIE INSP FOUND 1 FASTENER HOLE CRACKED IN TENSION TIE AT UPPER DECK BS 1140 STR 9R. MAJOR REPAIR ACCOMPLISHED: CUT OUT DAMAGED AREA, SPLICED IN NEW SECTION.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING STAGE 2 TENSION TIE INSP FOUND 1 FASTENER HOLE CRACKED IN TENSION TIE AT UPPER DECK BS 1140 STR 9R. MAJOR REPAIR ACCOMPLISHED: CUT OUT DAMAGED AREA, SPLICED IN NEW SECTION.