What was found
(ENG 1 COMPRESSOR STALL), CHECK INLET, EXHAUST AND MASTER CHIP DECTECTOR, REPORT FINDINGS TO SAMC, OPBLM EMC ARSHAD. LCL FBO ACCOMPLISHED VISUAL INSP OF ENG 1 INLET & EXHAUST, NO DEFECTS NOTED, CHECKED MASTER CHIP DETECTOR, NO DEFECTS NOTED. PFR SHOWS FLT PHASE 6, ENG1 FADECXX, ENG1 STALLXX WITH VSV ACT- HC-EEC1, VSV MECH-BLD VLV-LPC1 AND CHA VSV ACT-HC-EEC1, IN ADDITION TO STALL TROUBLESHOOTING, REPLACE VSV ACT MR75326 AND 75-30-00-810-843 WITH NO DEFECTS NOTED. REPLACED VSV. ACCOMPLISHED LEAK CHK AND POWER ASSURANCE. NO DEFECTS NOTED.