As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
LOAD SHED ISSUES. DUE TO REPORT OF RT HYD QTY INDICATION DROP TWO TIMES AND FWD AND RT AFT GALLEY POWER WENT OFF NEED TO PERFORM A VISUAL INSPECTION OF RT GEN BREAKER TERMINALS (3 PHASE) C903. REPLACED RELAY & REPLACED NR 2 ENG IDG PER MM.