What was found
NR 9 SLAT WEDGE DELAMINATED AT IB TRACK AREA. TEMP INJECTION REPAIR ACP AND ULTRASONIC VERIFIED NO DISBOND. REMOVED THE SLAT, BONDING REPAIRED PER SRM. TOUCH UP PAINT PER AMM. REINSTALLED THE SLAT PER AMM. ADJUSTED AND OPS TEST OKAY.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 9 SLAT WEDGE DELAMINATED AT IB TRACK AREA. TEMP INJECTION REPAIR ACP AND ULTRASONIC VERIFIED NO DISBOND. REMOVED THE SLAT, BONDING REPAIRED PER SRM. TOUCH UP PAINT PER AMM. REINSTALLED THE SLAT PER AMM. ADJUSTED AND OPS TEST OKAY.