As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
RT INBD MAIN FLAP UPPER SURFACE HAS A 1.2" LONG GOUGE, .26' IN WIDTH AND A DEPTH OF .022 INCORPORATING 2 EA FASTENERS. THIS GOUGE IS LOCATED 77 INCHES FROM INBD EDGE AND 15. 5 INCHES FWD OF T/E. THIS GOUGE IS LOCATED 77 INCHES FROM INBD EDGE AND 15. 5 INCHES FWD OF T/E. REPAIRED IAW EA PD- 57-57-(035) AND EVA 80387.