Service difficulty report · Socket · Boeing 757222

Difficulty date
July 11, 2011
Submitted
August 11, 2011
Operation
Air carrier
Aircraft
N551UA
Make and model
Boeing 757222
Aircraft serial
25399
Aircraft time
74,894 hours, 21,674 cycles
Engine
Pwa PW2037
Part
Socket
Condition
Missing
Location
Fuel System
Stage of operation
NR
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LEFT CTR BOOST PUMP INOP. CTR L FUEL PUMP EICAS MSG AND NO TRANSFER INTO LEFT MAIN FUEL MAN. MAINT TEXT: OPB AND DD REFUSAL USING MEL 2822G LEFT CENTER PUMP INOP DUE PAYLOAD PENALTY AND ETOPS CRITICAL. TRANSFERED FUEL FROM MAIN TO CENTER TANKS, BOTH CENTER PUMPS INTERMITTENT WHEN TRYING TO TRANSFER BACK TO MAIN. WHILE PERFORMING CHK PER WD FOUND SOCKETS B3, B2 FROM RELAY K10872 MISSING. SUGGEST WORKING ITEM EG5768 TO CHK REST OF WIRING DUE TO GSO PERFORMING WIRING COA. USE WD 28-22-11 PG 3.1A SHEETS 1 THRU 3. SUGGEST DISCONNECTING S10010 & S10011 CONNECTORS & THEN TRYING COCKPIT CTR PUMP SWITCHES. ACCMP'D FIM 28-22-00 CTR PUMPS OPERATE NORMAL.