What was found
INTERCOSTALS CORRODED WHERE ATTACHED TO FLOORBEAM UPPER CHORD AT BS 365 FROM RBL 24 TO RBL 45. MAJOR REPAIR ACCOMPLISHED: REMOVED SUPPORT CHANNEL FROM STA 400-418 RBL 10-25 AND STA 365-418 RBL 12-25 AND INTERCOSTAL FROM STA 365-418 RBL 24 & RBL 45 IAW SRM. FABRICATED 2 EA INTERCOSTALS FROM STA 365-418 RBL 24 & RBL 45 IAW BOEING DWG 141N5131. TREATED AND PRIMED NEW INTERCOSTALS IAW 029887AMM. APPLIED TOP COAT PAINT. INSTALLED 2 EA INTERCOSTAL RBL 24 & RBL 45 AND SUPPORT PANEL STA 365 -418 RBL 10-25 AND RBL 12-25 IAW B757.