What was found
HYDRAULIC SUPPLY LINE NR 2 ENGINE HAS RUBBER INSULATION WORN THROUGH EXPOSING BRAIDED METAL. INSTALLED AND LEAK CHECKED LINE. LEAK CHECKED GOOD ON ENGINE RUN. REPLACED NR 2 ENGINE HYD CLAMPS PER MM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
HYDRAULIC SUPPLY LINE NR 2 ENGINE HAS RUBBER INSULATION WORN THROUGH EXPOSING BRAIDED METAL. INSTALLED AND LEAK CHECKED LINE. LEAK CHECKED GOOD ON ENGINE RUN. REPLACED NR 2 ENGINE HYD CLAMPS PER MM.