As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DUE TO A MAJOR REPAIR OF THE BS 324 FLOORBEAM UPPER CHORD DURING HMV 3 VISIT, AN INITIAL FIRST STAGE APPROVAL WAS RECEIVED. THIS REPAIR MUST RECEIVE A NEW 8100-9 SHOWING COMPLAINCE TO 14CFR 25.571 AND 26.43(D) AND DTA INCORPORATED INTO THE AIRCRAFT MAINTENANCE PROGRAM WITHIN 24 MONTHS FROM NOV 3RD 2011 FOR THIS REPAIR TO REMAIN VALID AND AIRCRAFT TO REMAIN AIRWORTHY.