What was found
CAPT'S NR 2 WINDOW HAS DELAMINATION AND MOISTURE INGRESS IN FWD LOWER CORNER. BEGAN REMOVAL OF NR 2 LT WINDOW PER MM. CONTINUED NR 2 LT WINDOW INSTALLATION PER MM. COMPLETED ITEMS 3A THRU 3H. NEED TO COMPLETE ITEM 3I. REPLACED NR 2L WINDSHIELD & RE-INSTALLED CRASHPADS, SUNSHADES SUNVISORS & RAILS + DEFROST AIR DISTRIBUTION DUCT. NR 2L WINDOW HEAT SYS NEEDS OPS CHECK PER MM ON ACCT OF WINDSHIELD REPLACEMENT. ACP'D 2L WINDOW HEAT SYSTEM TEST, TESTS GOOD.