What was found
TEST 1 RIGHT SIDE SLIDE NO TEST. REPLACED RIGHT SIDE FWD SLIDE BATTERY PACK, TEST OKAY. ACCOMPLISHED CRITICAL STEP INSPECTION FOR INSTALLATION OF RT SLIDE BATTERY PACK. INSTALLED BATTERY PACK PER MM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
TEST 1 RIGHT SIDE SLIDE NO TEST. REPLACED RIGHT SIDE FWD SLIDE BATTERY PACK, TEST OKAY. ACCOMPLISHED CRITICAL STEP INSPECTION FOR INSTALLATION OF RT SLIDE BATTERY PACK. INSTALLED BATTERY PACK PER MM.