As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
NR 1 ENG STALL ECAM. ACCOMPLISHED FUNCTIONAL CHECKS OF THE HPC 7TH STAGE A, B & C SOLENOID VALVES PER AMM, HPC 7TH STAGE BLEED VALVES PER AMM. HPC 10TH STAGE SOLENOID VALVE PER AMM AND 10TH STAGE BLEED VALVE PER AMM. ACCOMPLISHED ALL TASKS IN TSM 71-00-00-810-808. ALL BLEED AND SOLENOID VALVES CHECKED OK. ACCOMPLISHED LUBE OF VSV AND 2.5 BLEED, CHECKED OK. ACCOMPLISHED POWER ASSURANCE RUN AT 1.39 EPR WITH NO FAULTS.