What was found
FUSELAGE SKIN AT R-4 DOOR CUTOUT LOWER EDGE HAD 3 EACH MISDRILLED HOLES. INTERIM REPAIR INSTALLED STA 1655-1675 BETWEEN S-15R AND S-19R PER ECRA 5330-04378 REQUIRES REPEAT INSP PER STEP 11 OF ECRA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FUSELAGE SKIN AT R-4 DOOR CUTOUT LOWER EDGE HAD 3 EACH MISDRILLED HOLES. INTERIM REPAIR INSTALLED STA 1655-1675 BETWEEN S-15R AND S-19R PER ECRA 5330-04378 REQUIRES REPEAT INSP PER STEP 11 OF ECRA.