What was found
EFCS OP TEST STBY PWR SP, ACCOMPLISH OPERATIONAL CHECK OF THE LOGICS ACTIVATING, ELAC 1, ELAC 2 AND SEC 1 STANDBY POWER SUPPLY, TO CONFIRM THE ABILITY OF SEC 1 AND SEC 2 TO ACHIEVE PITCH CONTROL, TO CONFIRM THE ABILITY OF SIDESTICK PRIORITY FUNCTION, PER MM TASK 27-96-00-710-018. FOR FAILED TEST APPLY T-S SOLUTIONS AS LISTED IN TSM TASK 27-96-00-810-801. PERFORMED STBY PWR OP TEST. OPS CHECK NORMAL. NO FAULTS FOUND.