What was found
CORROSION RBL 48, BS 1681 TO BS 1710 PRESSURE DECK. MAJOR REPAIR ACCOMPLISHED. REMOVED CORROSION AT RBL 48, BS 1681 TO BS 1710 PRESSURE DECK IAW B757-200 SRM 51-10-02 PAR 15, FIG 1. ORIGINAL MATERIAL THICKNESS IS.071, MATERIAL REMOVED AT DEEPEST LOCATION IS .023, MATERIAL REMAINING IS .048 AND IS OUT OF LIMITS IAW B757-200 SRM 53-60-51, PAR 4, FIG 101. REPAIRED BLENDED AREA IAW ECRA 5330-04259.