What was found
DURING 2 SVC CHECK OF EMERGENCY LIGHTS EPSU INT LOAD EMER L. RESEATED LEFT OVERWING POWER SUPPLY TESTED OK PER MM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 2 SVC CHECK OF EMERGENCY LIGHTS EPSU INT LOAD EMER L. RESEATED LEFT OVERWING POWER SUPPLY TESTED OK PER MM.