Service difficulty report · Engine · Emb ERJ170100SE

Difficulty date
March 17, 2010
Submitted
March 22, 2010
Operation
Air carrier
Aircraft
N631RW
Make and model
Emb ERJ170100SE
Aircraft serial
17000007
Aircraft time
15,807 hours, 9,918 cycles
Engine
Ge CF348E5
Engine time
14,751 hours, 10,554 cycles
Part
Engine
Part number
CF348E5
Part serial
GEE193158
Condition
Vibration
Location
Nr 2
Part time
14,751 hours, 10,554 cycles
Stage of operation
TO
How discovered
O
Nature of condition
E
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

WAITING TO TAKEOFF CAPTAIN NOTICED A VIBRATION IN RUDDER PEDALS. NOTHING ABNORMAL NOTED. AT V1, HEARD A LOUD THUMP, THEN A CONTINUOUS LOUD NOISE AND VIBRATION. NO EICAS MESSAGES OR ANY OTHER INDICATIONS OF A PROBLEM. ASKED TO RETURN TO FIELD AND DECLARED AN EMERGENCY. THE RAT WAS REPORTED DEPLOYED AT SOME POINT PRIOR TO OR AT TAKEOFF. CREW ALSO REPORTED VIBRATION. THE FHDB SHOWED NO ABNORMAL FAULT THAT COULD CAUSE RAT DEPLOYMENT DURING ROLL TO TAKEOFF, THAT IS FROM 18:28H TO 18:42H. THE DVDR READS THAT THE RAT DEPLOYED AT 18:28:31. THE VIBRATIONS WERE TROUBLESHOT DOWN TO THE NR 2 ENGINE AND THE RAT WAS STOWED. THE A/C WAS THEN FERRIED TO IND AND THE CREW THAT FERRIED IT REPORTED, IN IDLE THE VIBES WERE VERY NOTICEABLE THROUGH THE RUDDER PEDALS AND AIRFRAME. ONCE ON THE TAKEOFF ROLL THE VIBES WERE DISSIPATING THE HIGHER THE N1 GOT. ONCE AT ROTATION THE VIBES WERE VERY LIGHT, DID NOT THINK THE RAT WOULD DROP WITH THE VIBES EXPERIENCED AT ROTATION. WITH THE TROUBLESHOOTING PERFORMED AND VIBES DISSIPATING AT HIGHER POWER, DO NOT BELIEVE THE RAT DROPPED DUE TO VIBRATION. IND MAINTENANCE PERFORMED THE FOLLOWING TASKS LAST NIGHT: 3.1 PERFORM AMM II TASK 24-23-00-710-801-A RAM-AIR-TURBINE (RAT) MANUAL DEPLOYMENT-- OPERATIONAL TEST 3.2 PERFORM AMM II TASK 24-23-05-820-801-A RAM-AIR-TURBINE (RAT) DEPLOYMENT ACTUATOR- ADJUSTING 3.3 PERFORM AMM II TASK 24-23-07 RAM-AIR-TURBINE (RAT) UPLOCK ASSEMBLY. THERE WERE NO FINDINGS REPORTED IN REGARDS TO THE MM TASKS, SO THE UPLOCK ASSY WAS REPLACED. THE E2 WAS ALSO REPLACED DUE TO THE VIBRATIONS.