What was found
MAJOR REPAIR - RIGHT RIB 10 EXTENSION CRACKED AT THIRD FASTENER HOLE. STOP DRILLED CRACK FOR TEMP REPAIR IAW ETD 2013-170-001741-B.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAJOR REPAIR - RIGHT RIB 10 EXTENSION CRACKED AT THIRD FASTENER HOLE. STOP DRILLED CRACK FOR TEMP REPAIR IAW ETD 2013-170-001741-B.