What was found
DURING ACCOMPLISHMENT OF SB 747-53-2272 FOUND ONE CRACKED HOLE BS 380 R/S AT STRINGER 14R. STOP DRILLED CRACK, INSTALLED REPAIR DOUBLER PER STANDARD PRACTICES IN A NON-MANDATORY ZONE. AMOC APPROVED PER PAR 9 OF AD 91-11-01. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING ACCOMPLISHMENT OF SB 747-53-2272 FOUND ONE CRACKED HOLE BS 380 R/S AT STRINGER 14R. STOP DRILLED CRACK, INSTALLED REPAIR DOUBLER PER STANDARD PRACTICES IN A NON-MANDATORY ZONE. AMOC APPROVED PER PAR 9 OF AD 91-11-01. (M)