What was found
DURING C-CHECK, FOUND RT KICK FITTING BOLT HOLES POSITION A, B AND K STILL SHOWING CRACK INDICATION AFTER 2ND OVERSIZE REAMING. PERMANENT REPAIR WITH DEVIATION TO REF 'A' SB PER REF 'B', 'C', AND 'D' BY OVERSIZING HOLE 'A', 'B'B AND 'K' THROUGH ALL COMPONENTS IN THE STACKUPS AT EACH LOCATION ON THE RIGHT SIDE SPLICE BEYOND THE LIMITS OF REF 'A' SB TO HOLE DIAMETERS OF 1.00, 1.040 AND .8750 INCH RESPECTIVELY. A SLEEVED BOLT WAS INSTALLED IN HOLE 'B'.