What was found
DURING C-CHECK, AT AMS NR 1 PYLON OUTBOARD SPRING BEAM SHEAR TRANSFER FITTINGS FOUND CRACKED DUE TO CONTACT WITH SPRING BEAM. CONTRACT RESULTED FROM MIS-LOCATION OF FITTINGS. SUBJECT FITTING WERE TRIMMED TO REMOVE CRACK & DAMAGE, NDT INSPECTED, & RESTORED PER DRAWING. FITTINGS. CRACK FOUND ON FITTING .47 INCH LONG. ACCOMPLISH A VISUAL INSP NR 4 PYLON. PROBLEM DID NOT OCCUR AT PYLON NR 4. DAMAGE FOUND ON FITTING 69B94120-3. DAMAGED AREA WAS TRIMMED. THE REPAIRS ARE STRUCTURALLY ACCEPTABLE AND SUFFICIENT CLEARANCE IS PROVIDED. CONDUCT A DETAIL VISUAL INSPECTION OF THE FITTING & INSTALLATION EVERY 6 MONTHS TO CONFORM NO FURTHER CRACKING OR DAMAGE TO THE FITTINGS. REPLACE THE FITTING WITHIN 18 MONTHS. (M)