What was found
DURING C-CHECK, NR 1 PYLON OB SPRING BEAM SHEAR TRANSFER FITTINGS FOUND DAMAGED DUE TO CONTACT WITH SPRING BEAM. CONTRACT RESULTED FROM MISLOCATION OF FITTINGS. SUBJECT FITTINGS WERE TRIMMED TO REMOVED DAMAGE, NDT INSPECTED, & RESTORED PER DRAWING. FITTINGS OTHERWISE MET DRAWING REQUIREMENTS. CRACK FOUND ON FITTING 69B941204, .47 INCH LONG. ACCOMPLISH A VISUAL INSP NR 4 PYLON. PROBLEM DID NOT OCCUR AT PYLON NR 4. DAMAGE FOUND FITTING 69B94120-3. DAMAGE TRIMMED. REPAIRS STRUCTURALLY ACCEPTABLE & SUFFICIENT CLEARANCE PROVIDED. CONDUCT A DETAIL VISUAL INSPECTION OF FITTING & INSTALLATION EVERY 6 MONTHS TO CONFIRM NO OTHER FURTHER CRACKING OR DAMAGE TO THE FITTING, REPLACE FITTING WITHIN 18 MONTHS. (M)