What was found
AT APPROXIMATELY 10,000 FT, NR 2 ENIGNE 'A' LOOP WAS INDICATING 7 UNITS, 'B' LOOP INDICATING 2.5. COMPLETED FHB 3.26.10 PROCEDURES NACELLE TEMPERATURE INDICATION ABNORMAL. RETARDED THROTTLE NO CHANGE, 30 SECON LATER 'A' LOOP INDICATES 9 PLUS, 'B' LOOP FLUCTUATES BETWEEN 2.5 AND 7.5. ENGINE FAILURE SHUTDOWN CHECKLIST ACCOMPLISHED. NR 2 ENGINE 'B' LOOP FOUND CHAFFING WIRES. REPAIRED WIRES AS PER SWPM 20-20-00 AND OPERATION CHECK SATISFACTORY AS PER MM 26-01-00. (M)