What was found
DURING SCHEDULE MAINTENANCE, FOUND CRACK DAMAGE AT PRE-COOLER EXHAUST CUTOUT LOWER AFT CORNER AT NAC STATION 248, NR 1 PYLON. TRIMMED THE NR 3 STIFFENER BASE BOTTOM TO REMOVE THE CRACK. TRIMMED THE SKIN ASSEMBLY AND WINDOW STRAP. NDT INSPECTED EACH REPAIR AREA, INCLUDING HFEC INSPECTION OF ALL REPAIR FASTENER LOCATIONS AND TRIMMED EDGES TO ENSURE ABSENCE OF CRACKS, CORROSION AND ANY OTHER DAMAGE. INSTALLED ALUMINUM FILLER AT EACH TRIMMED AREA. THE NR 3 STIFFENER WAS REINFORCED WITH A NEW STEEL LOWER REPAIR ANGLE FROM NAC STATION 235 TO NAC STATION 254. THE RIB INSTALLATION AT NACELLE STATION 248 WAS MODIFIED TO ACCOMMODATE THE NEW STEEL REPAIR ANGLE INSTALLATION ON THE NR 3 STIFFENER. (M)