What was found
DURING SCHEDULED MAINTENANCE INSPECTION, THE BULKHEAD UPPER ASSY FORWARD ANGLE FRAME OF THE NR 2 PYLON LT AND RT SIDE WERE FOUND CRACKED. FABRICATED AND INSTALLED REPAIR ANGLES ON THE FORWARD AND AFT FRAMES IN THE REPAIR AREA. INSTALLED THE REPAIR ANGLES BY PICKING-UP ALL EXISTING FASTENER LOCATIONS AFFECTED BY THE REPAIR PARTS WITH LOCK FASTENERS. CONDUCT REPEAT DETAILED VISUAL INSPECTION OF THE FORWARD FRAMES AT THE REPAIRS AND ADJACENT CHORD AREA EVERY C-CHECK OR 18 MONTHS WHICHEVER IS FIRST, FOR CRACK, LOOSE FASTENERS AND DAMAGE. EO TO BE ISSUED TO ACCOMPLISH INSPECTION AT 18 MONTH INTERVALS OR C-CHECK WHICH EVER IS FIRST.