What was found
REF EO 4778A150- NR 2 T/R ACCESS AMD BLOWOUT DOOR REPAIR. PART ONE TIME LIMITED REPAIR ACCOMPLISHED. PART TWO INSPECTION REQUIRED EVERY FLIGHT CYCLE (SCHEDULE WITHIN 10 CALENDAR DAYS AFTER ACCOMPLISHMENT PART 1).
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
REF EO 4778A150- NR 2 T/R ACCESS AMD BLOWOUT DOOR REPAIR. PART ONE TIME LIMITED REPAIR ACCOMPLISHED. PART TWO INSPECTION REQUIRED EVERY FLIGHT CYCLE (SCHEDULE WITHIN 10 CALENDAR DAYS AFTER ACCOMPLISHMENT PART 1).