What was found
RT OTBD MID TO AFT FLAP SUPPORT LINKAGE STRUCTURE PN 65B39149-19/21 WAS FOUND DAMAGED, WITH A GOUGE/DENT. "AFTER BLEND OUT THE REWORKED AREA MEASURED 0.500 IN WITH A 0.013 IN DEPTH. IN ADDITION, INSPECTION OF THE DAMAGE WAS PERFORMED AS DESCRIVED IN THE PART 1 WORK INSTRUCTIONS. NO EVIDENCE OF CRACKS OR OTHER DAMAGE. THE BLEND OUT REPOAR WAS FOUND FREE OF CRACKS OR OTHER DAMAGE AN DTO BE WITH IN THE ALLOWABLE DAMAGE LIMTS IAW SRM 53-00-01."