What was found
DURING D02/C03 CHECK, GOUGE DAMAGE WAS FOUND TO THE MAIN DECK BS 1917, RBL 49 WEB OF LATERAL GUIDE SUPPORT (REF FIG 1 THRU 3, PN 65B20024-65). GOUGE WAS CLEANED, BLENDED OUT AND REWORKED IAW EGAT EI T2010A53B-1513 ON WEB IAW THE SRM 53-60-53 WITHIN ALLOWABLE LIMITS AS DEFINED BY THE MFG AND ENSURED NO CRACK AT REWORKED AREA BY HFEC IAW NDT MANUAL PART 6, 51-00- 00. SURFACE FINISHED IAW SRM 51-20-01. MFG REVIEWED AND THE REPAIR PROPOSAL IS STRUCTURALLY ACCEPTABLE PROVIDED THAT A 63RHR OR BETTER SURFACE FINISH IS MAINTAINED FOR THE BLENDED WEB. (REF SR 1-1640130216 AND MFG RDR, FIGURE 4)