What was found
DURING WALKAROUND INSP AT STN, DAMAGE WAS DISCOVERED AT RT WBL238.30. FIXED T/E UPPER RIB INSTALLATION CONSISTING IN BROKEN TIE ROD AND CLEVIS. (THE BROKEN ROD WAS REMOVED AND A DETAIL VISUAL INSP WAS PERFORMED TO ASSURE DAMAGE-FREE CONDITION TO THE SURROUNDING STRUCTURE. DISPOSITION WAS MADE TO SCHEDULE REPEAT INSPECTIONS AT EVERY 1 FC AND PERMANENT REPAIR (REPLACEMENT OF BROKEN TIE ROD AND CLEVIS) PRIOR TO THE ACCUMULATION OF 25 FC.)