What was found
DURING CARGO LOADING AT HSV; MX FOUND DAMAGE TO THE MAIN DECK FLOORBOARD AT BS 400, RBL 15 (REF FIG 1). THE DAMAGE IS 1.5 INCHES LONG AND ABOUT 0.125 INCH WIDE. (PART 1: REMOVE LOOSE MATERIAL AND CLEAN UP THE EDGES OF THE DAMAGED FLOOR PANEL SRM 51-20-01. SEAL THE DAMAGED AREA USING SPEED TAPE AND SEALING RESIN IAW SRM 53-00-50, FIG 101, NOTE C. PART 2 OF THIS EO ACCOMPLISHES REPETITIVE DETAILED INSPECTIONS OF THE PART 1 REPAIR TO ENSURE CONTINUED AIRWORTHINESS. ACCOMPLISH PART 3 OF THIS EO AT THE NEXT A-CHECK AFTER PART 1. PERMANENT REPAIR IAW PART 3 OF THIS EO TERMINATES THE PART 2 INSP.)